Final | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 13:22:59. Contact: ###-####.
|
Final | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 13:09:54. Contact: ###-####. GFCIs not working 8/3/2001 11:34:12 AM
|
Permanent Service | 7/6/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 7/6/2001 10:43:10 AM p/s u/g n ok
|
Electrical Rough-In | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PART |
Mike Kinnear
|
|
|
###-#### ok cover ceiling drops 6/11/2001 1:55:04 PM
|
Electrical Rough-In | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | NR |
Mike Kinnear
|
|
|
duane ###-#### not ready framing not completed & they need to staple closer to units (ceilings) 6/6/2001 12:54:50 PM
|
Electrical Rough-In | 5/24/2001 | 5/25/2001 | 5/25/2001 | A | PASS |
Pat Lass
|
|
|
Duane ###-#### bldg #5
|
Electrical Rough-In | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Jack Frank
|
|
|
furnish and install wiring-vicki ###-#### ok south half of building all 3 floors drop ceiling area not ready yet 5/21/2001 5:21:20 PM
|