Final | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 08:08:52. Contact: ###-####.
|
Final | 5/29/2001 | 5/29/2001 | 5/29/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 05/29/2001 at 08:23:53. Contact: ###-####. insulated grd back to panel/manufactures spec #6 cu 5/29/2001 3:42:25 PM
|