Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
fn insp sadan-- ###-#### -fn -????already done????
|
Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
fn insp sadan-- ###-#### -fn -????already done????
|
Final | 7/6/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 16:02:10. Contact: ###-####. ok final 7/9/2001 2:13:06 PM
|
Final | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | PASS |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 7/9/2001 2:14:40 PM DOC FINAL
|
Permanent Service | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 11:41:14. Contact: ###-####. ok cover concrete uffer ground 6/20/2001 11:33:08 AM
|
Rough-In Permanent Service | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 16:31:37. Contact: ###-####. concrete electrode ok for cover/trench ok for cover 6/19/2001 10:02:53 AM
|
Electrical Rough-In | 6/14/2001 | 6/14/2001 | 6/14/2001 | P | PART |
Joe Ray
|
|
|
Al's Electric ###-#### late pm if possible r/i on garage ok/no inspection on trench to the garage/shall have concrete electrode 6/14/2001 2:25:26 PM
|