Final | 8/15/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Pat Lass
|
|
|
tower 2 final ###-####
|
Final | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by Inspector: 336 On 8/16/2001 10:39:11 AM
|
Final | 8/15/2001 | 8/16/2001 | 8/16/2001 | A | PART |
Pat Lass
|
|
|
tower 1 final ###-####
|
Rough-In Permanent Service | 6/29/2001 | 6/29/2001 | 6/29/2001 | P | PASS |
Pat Lass
|
|
|
Added by Inspector: 336 On 6/29/2001 2:03:20 PM P/S U/G N Ok two services ok with shunt trip per J Schmer
|
Electrical Rough-In | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PASS |
Pat Lass
|
|
|
Added by Inspector: 336 On 6/22/2001 12:42:32 PM
|
Electrical Rough-In | 6/8/2001 | 6/8/2001 | 6/8/2001 | P | PART |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PART |
Jack Frank
|
|
|
Duane ###-#### Lea ok , DCI cable systems needs riser rated tv cable talked with contractor at job site see JF if ? 6/5/2001 3:52:36 PM
|