Final | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 10:07:12. Contact: ###-####.
|
Final | 6/8/2001 | 6/12/2001 | 6/12/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/08/2001 at 10:39:51. Contact: ###-####. Bonding Grounding and fixture location 6/12/2001 9:57:53 AM
|
Final | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | NH |
Pat Lass
|
|
|
service upgrade and a hot tub ###-#### wayne called no access 6/7/2001 11:54:54 AM
|