Final | 11/9/2001 | 11/13/2001 | 11/13/2001 | A | PASS |
Pat Lass
|
|
|
JEFF ###-####
|
ELE-Aging Inspection | 9/14/2001 | 9/14/2001 | 9/14/2001 | | NR |
Pat Lass
|
|
|
SUC 9/14/2001 8:48:29 AM
|
Rough-In Permanent Service | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 10:57:45. Contact: ###-####. p/s u/g new - ok 6/12/2001 12:55:13 PM
|
Electrical Rough-In | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | NR |
Pat Lass
|
|
|
Shawn ###-#### 2 rooms Nail plates Partial? 6/11/2001 3:19:51 PM
|
Rough-In Permanent Service | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | FAIL |
Pat Lass
|
|
|
Added by Inspector: 336 On 6/11/2001 3:18:33 PM MBJ used as neutral conductor 6/11/2001 3:19:14 PM
|