Final | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PASS |
Jack Frank
|
|
|
John ###-####ok 8/16/2001 4:00:22 PM
|
Electrical Rough-In | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Jack Frank
|
|
|
###-#### r/i for heat trace ok 8/15/2001 3:10:39 PM
|
Electrical Rough-In | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Jack Frank
|
|
|
RISEN FLOOR INSP -JOHN ###-#### ok no cords or recepts allowed under floor Romar will redesign 8/8/2001 10:17:03 AM
|
Rough-In Permanent Service | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Jack Frank
|
|
|
###-#### john ceiling and service r/i ok p/s u/g new ok 8/6/2001 10:57:29 AM
|
Electrical Rough-In | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PASS |
Mike Kinnear
|
|
|
john ###-#### wall in the existing part of the building ok cover walls only 6/29/2001 10:15:08 AM
|
Electrical Rough-In | 6/25/2001 | 6/25/2001 | 6/25/2001 | P | PASS |
Jim Schmer
|
|
|
underground ###-#### (check for branch circuits going into other building from storage shed !!!!) 6/25/2001 3:10:27 PM
|