Final | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 07/12/2001 at 10:05:35. Contact: ###-####. completed. 7/12/2001 4:47:07 PM
|
Electrical Rough-In | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 14:59:51. Contact: .
2-light switches ele r/i. ok. 6/14/2001 10:04:38 AM
|