Final | 7/17/2001 | 7/17/2001 | 7/17/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/17/2001 at 09:47:03. Contact: ###-####. the dogs are locked up and the gate is open and the inspection on the out building in the back no one will be home but go on back...
|
Electrical Rough-In | 6/15/2001 | 6/19/2001 | 6/19/2001 | A | PASS |
Pat Lass
|
|
|
Terry ###-#### or ###-#### P/S O/H N Ok 6/19/2001 10:43:30 AM
|
Electrical Rough-In | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | FAIL |
Pat Lass
|
|
|
###-#### Side gate will be open R/I ok np guy kit on riser for service 6/14/2001 11:13:06 AM
|