ELE-Aging Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | | DONE |
Pat Lass
|
|
|
done by Joe 11/7/2001 9:42:36 AM
|
Final | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 13:59:02. Contact: ###-####.
|
Final | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 11:17:39. Contact: ###-####. receps and boxes flush reverse line load bath GFCI 9/4/2001 10:38:52 AM
|
Permanent Service | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 13:22:22. Contact: ###-####. P/S U/G N Ok 8/6/2001 10:41:36 AM
|
Electrical Rough-In | 7/6/2001 | 7/6/2001 | 7/6/2001 | A | PASS |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 7/6/2001 10:43:54 AM ok cover ceilings only
|
Electrical Rough-In | 6/20/2001 | 6/21/2001 | 6/21/2001 | P | PASS |
Pat Lass
|
|
|
2nd tower\\###-####
|
Electrical Rough-In | 6/14/2001 | 6/15/2001 | 6/15/2001 | P | PART |
Pat Lass
|
|
|
BLD 2\\###-####
|