Final | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PASS |
Pat Lass
|
|
|
###-####
|
Final | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | FAIL |
Pat Lass
|
|
|
###-#### MIKE open wires and floor boxes 10/19/2001 10:44:53 AM
|
Final | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 14:42:46. Contact: ###-####. Signed T/O floor receps, grounding in relay box, and panel clearance left 10/12/2001 10:29:41 AM
|
Electrical Rough-In | 10/10/2001 | 10/11/2001 | 10/11/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 15:50:33. Contact: ###-####.
|
Electrical Rough-In | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 17:14:23. Contact: ###-####. all ceiling tile shall be removed 10/5/2001 11:09:06 AM
|
ELE-Aging Inspection | 8/21/2001 | 8/21/2001 | 8/21/2001 | | NR |
Pat Lass
|
|
|
SUC 8/21/2001 8:14:07 AM
|
Permanent Service | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PASS |
Pat Lass
|
|
|
###-#### ###-#### P/S U/G Ok 6/21/2001 9:10:44 AM
|
Electrical Rough-In | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 6/18/2001 | 6/19/2001 | 6/19/2001 | A | FAIL |
Pat Lass
|
|
|
###-#### 300-4 damaged MC listing of connectors 6/19/2001 9:22:57 AM
|