Final | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PASS |
Jack Frank
|
|
|
final as per jf
|
Electrical Rough-In | 7/20/2001 | 7/23/2001 | 7/23/2001 | A | PASS |
Jack Frank
|
|
|
guy wire on the mast Warren ###-#### ok 7/23/2001 10:19:34 AM
|
Final | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | FAIL |
Jack Frank
|
|
|
888--4778 all corrections not made still needs to install guy kit , and secure recepts that are loose break room talked to contractor at job site 7/20/2001 11:17:02 AM
|
Electrical Rough-In | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Jack Frank
|
|
|
partial on one room call first \\###-#### late am please chapel and kitchen breakroom walls ok 7/11/2001 12:46:31 PM
|
Electrical Rough-In | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PART |
Pat Lass
|
|
|
r/i for interior walls partial warren ###-####
|
Rough-In Permanent Service | 6/19/2001 | 6/21/2001 | 6/21/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 23:55:40. Contact: .
grounding guy kit 2 services strap flex 6/21/2001 10:37:40 AM
|