Final | 9/24/2001 | 9/26/2001 | 9/26/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 14:10:14. Contact: ###-####.
|
Electrical Rough-In | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 14:20:29. Contact: ###-####.
|
Permanent Service | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Pat Lass
|
|
|
randy ###-#### P/S U/G N Ok 7/11/2001 11:33:11 AM
|
Permanent Service | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | NH |
Pat Lass
|
|
|
will reschedual 7/9/2001 3:01:35 PM
|
Electrical Rough-In | 6/29/2001 | 6/29/2001 | 6/29/2001 | P | PASS |
Pat Lass
|
|
|
9 units ###-####
|