Final | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 13:15:56. Contact: ###-####.
|
Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 13:09:05. Contact: ###-####. 410-8 and wiring for whole house fan shall be wired in parallel 9/18/2001 2:06:13 PM
|
Final | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | FAIL |
Pat Lass
|
|
|
Added by Inspector: 336 On 9/18/2001 1:39:30 PM fan and closet lights
|
Electrical Rough-In | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 11:53:46. Contact: ###-####.
|
Electrical Rough-In | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 07:19:20. Contact: ###-####.
|
Rough-In Permanent Service | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 07:20:05. Contact: ###-####.P/S U/G Ok N 7/18/2001 3:35:58 PM
|