Final | 8/3/2001 | 8/6/2001 | 8/6/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 12:24:00. Contact: ###-####.
|
Final | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 14:01:23. Contact: ###-####. Raised cover recep 8/3/2001 12:09:58 PM
|
Final | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 14:17:43. Contact: ###-####. GFCI in bathroom X-form vent grounding recep in raised cover 8/2/2001 12:48:46 PM
|
Electrical Rough-In | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PASS |
Jim Schmer
|
|
|
late pm ceiling trim out\\###-#### john
|
Electrical Rough-In | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | FAIL |
Jack Frank
|
|
|
ceiling trim out\\###-#### 300-11 shall install wire to support cables, and strap MC cable as code states 12 inches of boxes and fixtures and every 6 ft article 334 -10 talked to contractor at job site 7/26/2001 2:50:52 PM
|
Electrical Rough-In | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PART |
Pat Lass
|
|
|
hard ceiling rough in ###-####
|
Electrical Rough-In | 7/10/2001 | 7/11/2001 | 7/11/2001 | A | PART |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Pat Lass
|
|
|
r/i -re-insp --sunshine anetta- ###-#### Protect MC within 1 1/4" 7/10/2001 2:50:35 PM
|
Electrical Rough-In | 7/9/2001 | 7/9/2001 | 7/9/2001 | P | FAIL |
Pat Lass
|
|
|
###-#### Protect MC 7/9/2001 4:57:19 PM
|