Final | 8/8/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 18:05:30. Contact: ###-####.
|
Rough-In Permanent Service | 7/11/2001 | 7/11/2001 | 7/11/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 09:08:59. Contact: ###-####. p/s ug n ok 7/11/2001 2:50:26 PM
|
Rough-In Permanent Service | 7/6/2001 | 7/10/2001 | 7/10/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/06/2001 at 13:14:21. Contact: ###-####. 300-4 protection with in 1 1/4 7/10/2001 1:05:34 PM
|