Final | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 09:42:47. Contact: ###-####.
|
Final | 11/16/2001 | 11/19/2001 | 11/19/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/16/2001 at 12:14:30. Contact: ###-####. called corrections not made 370-20 boxes not flush with combustible material 11/19/2001 10:35:08 AM
|
Final | 11/15/2001 | 11/15/2001 | 11/15/2001 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 10:01:59. Contact: ###-####. boxes not flush with combustable materials 11/15/2001 2:50:56 PM
|
Final | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 10:38:02. Contact: ###-####. oversized lamps and cord attached to structure 11/5/2001 4:06:15 PM
|
Electrical Rough-In | 10/26/2001 | 10/26/2001 | 10/26/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 09:20:44. Contact: ###-####.
|
Permanent Service | 10/11/2001 | 10/15/2001 | 10/15/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 11:45:09. Contact: ###-####. P/S U/G N Ok 10/15/2001 10:34:51 AM
|
Electrical Rough-In | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 11:08:03. Contact: ###-####. U/G Ok 10/1/2001 4:30:43 PM
|
Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 09/27/2001 at 10:38:14. Contact: ###-####. 9/28/2001 9:52:11 AM underground for parking lot lighting. front and back 9/28/2001 9:55:04 AM
|
Electrical Rough-In | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 13:32:43. Contact: ###-####. walls ok 9/19/2001 11:51:37 AM
|
Electrical Rough-In | 9/13/2001 | 9/14/2001 | 9/13/2001 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 14:16:00. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/13/2001 at 16:24:50.
|
Electrical Rough-In | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 10:48:12. Contact: ###-####.
|
Electrical Rough-In | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 08:33:12. Contact: ###-####. No wall ok 9/4/2001 4:32:51 PM
|
Electrical Rough-In | 7/30/2001 | 7/31/2001 | 7/31/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 15:06:58. Contact: ###-####. U/G Ok 7/31/2001 3:11:24 PM
|
Electrical Rough-In | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 14:07:20. Contact: ###-####. u/g ok 7/26/2001 10:52:40 AM
|
Electrical Rough-In | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 12:58:54. Contact: . u/g for service 7/24/2001 11:04:35 AM
|
Rough-In Permanent Service | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 09:38:56. Contact: .
|