Final | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Joe Ray
|
|
|
###-#### call first to meet there
|
Final | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | FAIL |
Mike Kinnear
|
|
|
###-#### corrections need to see conduit deepth & potting of pool ligh 7/20/2001 1:10:40 PM
|
Electrical Rough-In | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | PASS |
Mike Kinnear
|
|
|
###-#### bonding inspection ok pool bonding 7/6/2001 12:19:03 PM
|