Final | 11/20/2001 | 11/21/2001 | 11/21/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/20/2001 at 12:31:30. Contact: .
|
Final | 11/19/2001 | 11/19/2001 | 11/19/2001 | P | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 07:58:14. Contact: . temp/occup 11/19/2001 2:27:10 PM
|
Final | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | FAIL |
Joe Ray
|
|
|
JARED 208 - ###-#### had conference with contr 11/16/2001 2:03:09 PM
|
Electrical Rough-In | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Pat Lass
|
|
|
CONFERENCE ###-####
|
Permanent Service | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Pat Lass
|
|
|
###-#### ###-####P/S U/G N Ok 10/9/2001 3:28:48 PM
|
Permanent Service | 10/8/2001 | 10/8/2001 | 10/8/2001 | P | FAIL |
Pat Lass
|
|
|
###-#### gerad grounding and bonding 10/8/2001 3:42:55 PM
|
Electrical Rough-In | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Marv Burrus
|
|
|
dan cox ###-####. back area walls r/i, bathroom walls r/i. 10/1/2001 10:55:01 AM
|
Electrical Rough-In | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | PART |
Pat Lass
|
|
|
jared ###-#### ok to oneside walls 9/25/2001 1:35:42 PM
|
Electrical Rough-In | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Marv Burrus
|
|
|
r/i for underground gas tank- ###-####- dan
8/10/2001 9:54:57 AM
|
Electrical Rough-In | 8/7/2001 | 8/8/2001 | 8/8/2001 | A | PART |
Pat Lass
|
|
|
###-####
|
Electrical Rough-In | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Pat Lass
|
|
|
UNDERGROUND\\###-#### DAN
|
Electrical Rough-In | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | PART |
Pat Lass
|
|
|
1-###-#### U/G OK 8/6/2001 2:35:25 PM
|
Electrical Rough-In | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Joe Ray
|
|
|
uffer ground insp--dan- 208/520/8577 cell
|