Permanent Service | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 3/19/2003 at 2:32:08 PM. Contact: ###-####.
|
Final | 3/3/2003 | 3/4/2003 | 3/4/2003 | A | FAIL |
Pat Lass
|
|
|
pat ,please call todd ###-#### so he can let you in ...
bond hot water. build platform for clearance and height problem. lock-out for water heater 3/4/2003 9:12:21 AM
|
Final | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | NH |
Jack Frank
|
|
|
###-#### notice posted called 1/23/2003 8:35:57 AM
|
Permanent Service | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | NH |
Jack Frank
|
|
|
notice posted called 1/23/2003 8:35:37 AM
|
ELE-Aging Inspection | 1/11/2002 | 1/11/2002 | 1/11/2002 | | NR |
Marv Burrus
|
|
|
no additional action. 1/11/2002 7:53:09 AM
|
ELE-Aging Inspection | 10/12/2001 | 10/12/2001 | 10/12/2001 | | NR |
Marv Burrus
|
|
|
no further inspections requested. 10/12/2001 9:01:20 AM
|
Permanent Service | 7/12/2001 | 7/13/2001 | 7/13/2001 | A | PART |
Marv Burrus
|
|
|
###-#### connection for power.
p/s oh recon. peak ele #2359-ok 7/13/2001 9:19:58 AM
|