Final | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 23:03:04. Contact: ###-####. three parking lot lights 8/17/2001 10:15:56 AM
|
Electrical Rough-In | 7/13/2001 | 7/13/2001 | 7/13/2001 | P | PASS |
Joe Ray
|
|
|
trench ###-#### put 1 1/2" pipe vertially straight over buried 1" conduit. Couldn't leave open. Warren
|