Final | 9/13/2001 | 9/13/2001 | 9/13/2001 | P | PASS |
Pat Lass
|
|
|
###-#### call first
|
Electrical Rough-In | 9/4/2001 | 9/4/2001 | 9/4/2001 | P | PASS |
Pat Lass
|
|
|
r/i heath- ###-####
|
Electrical Rough-In | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 16:22:17. Contact: ###-####. corrections completed. 8/1/2001 10:25:41 AM
|
Electrical Rough-In | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | FAIL |
Pat Lass
|
|
|
partial ###-#### Loose setscrews and missing locknut 7/31/2001 2:36:47 PM
|
Electrical Rough-In | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PART |
Pat Lass
|
|
|
###-#### ###-####rest rooms 7/18/2001 1:49:21 PM
|