Final | 10/3/2001 | 10/4/2001 | 10/4/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 13:15:08. Contact: ###-####.
|
Final | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 15:30:21. Contact: ###-####. closet light in 433 clearance 10/3/2001 11:37:17 AM
|
Electrical Rough-In | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 14:20:48. Contact: ###-####. ceiling sofits ok 8/17/2001 11:11:36 AM
|
Electrical Rough-In | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:43:47. Contact: ###-####. p/s ug n ok 8/3/2001 2:31:58 PM
|