Final | 10/5/2001 | 10/8/2001 | 10/8/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 08:37:33. Contact: ###-####.
|
Permanent Service | 8/1/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 07:27:31. Contact: ###-####. p/s ug n ok 8/1/2001 10:57:55 AM
|
Electrical Rough-In | 7/18/2001 | 7/18/2001 | 7/18/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 07/18/2001 at 07:48:53. Contact: ###-####. p/s ug n ok 7/18/2001 3:19:27 PM
|