Electrical Rough-In | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | FAIL |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 22:37:09. Contact: ###-####. Not the legal home owner on the deed. 9/5/2001 10:01:25 AM
|
Electrical Rough-In | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | FAIL |
Joe Ray
|
|
|
MIKE ###-#### 300-4 wire with in 1 1/4" /electrode conducter passing through rig nipple , not choked off at both ends /not all grds made up/ no tails for switches 8/31/2001 12:25:55 PM
|
Electrical Rough-In | 8/28/2001 | 8/29/2001 | 8/29/2001 | P | FAIL |
Jim Schmer
|
|
|
###-#### 300-4 (a)(d) and cover for panel 8/29/2001 12:45:39 PM
|