Final | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 08/07/2001 at 10:18:22. Contact: ###-####. completed. 8/7/2001 4:13:10 PM
|
Electrical Rough-In | 7/23/2001 | 7/24/2001 | 7/24/2001 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 14:26:08. Contact: ###-####. 1-room remodel; corrections completed.ok 7/24/2001 10:04:19 AM
|
Electrical Rough-In | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | FAIL |
Marv Burrus
|
|
|
###-####.shall have protection for nm cable at attic access, cable shall be secured to framing member (between levels0. 7/23/2001 2:09:25 PM
|