Final | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Jim Schmer
|
|
|
###-####- mark stairs not part of build, not needed to bond to service final, ok 5/9/2002 2:24:04 PM
|
Electrical Rough-In | 3/21/2002 | 3/22/2002 | 3/22/2002 | A | FAIL |
Pat Lass
|
|
|
MARK ###-#### grounding 3/22/2002 11:05:35 AM
|
Final | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | FAIL |
Pat Lass
|
|
|
###-#### MARK bond electrodes together 3/21/2002 3:32:10 PM
|
Electrical Rough-In | 1/15/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Pat Lass
|
|
|
Added by Inspector: 336 On 1/15/2002 9:44:12 AM outside walls and north office walls ok
|
Electrical Rough-In | 1/11/2002 | 1/14/2002 | 1/14/2002 | P | FAIL |
Pat Lass
|
|
|
MARK ###-#### protection 1/14/2002 5:19:04 PM
|
Electrical Rough-In | 1/7/2002 | 1/7/2002 | 1/7/2002 | P | PART |
Pat Lass
|
|
|
POWER TO PANEL MARK ###-#### P/S U/G N Ok 1/7/2002 3:43:26 PM
|
Permanent Service | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | FAIL |
Joe Ray
|
|
|
ser insp-- mark-- ###-#### 250- bond water and gas piping/finish service/called no answer 1/4/2002 1:41:46 PM
|
ELE-Aging Inspection | 12/31/2001 | 12/31/2001 | 12/31/2001 | | NR |
Pat Lass
|
|
|
SUC 1/3/2002 11:56:52 AM
|
ELE-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 | | NR |
Pat Lass
|
|
|
SUC 10/29/2001 12:38:18 PM
|
Electrical Rough-In | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PART |
Pat Lass
|
|
|
U/G ok conduit\\###-#### mark 8/28/2001 5:23:05 PM
|
Electrical Rough-In | 7/25/2001 | 7/27/2001 | 7/27/2001 | A | PASS |
Joe Ray
|
|
|
ufer ground Mark ###-####
|