Final | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 08:22:56. Contact: ###-####.
|
Final | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 09:41:01. Contact: ###-####.
|
Final | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 07:55:34. Contact: ###-####.
undersized grounds 4/8/2002 11:21:28 AM
|
ELE-Aging Inspection | 12/25/2001 | 12/25/2001 | 12/25/2001 | | NR |
Pat Lass
|
|
|
SUC 12/26/2001 8:53:09 AM
|
ELE-Aging Inspection | 10/25/2001 | 10/25/2001 | 10/25/2001 | | NR |
Pat Lass
|
|
|
carports south end SUC 10/25/2001 3:14:59 PM
|