Final | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 14:18:22. Contact: ###-####.
|
Final | 9/18/2001 | 9/19/2001 | 9/19/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 18:02:16. Contact: ###-####. Signed T/O Outside remains 9/19/2001 2:44:14 PM
|
Final | 9/18/2001 | 9/19/2001 | 9/18/2001 | A | CANC |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 14:31:51. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/18/2001 at 18:00:53.
|
Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 14:52:20. Contact: ###-####. boxes flush seal unused openings disconnect and grounding of out building outside lights require boxes floor boxes must be waterproof when in use 9/18/2001 2:20:42 PM
|
Electrical Rough-In | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 09:12:34. Contact: ###-####.
|
Electrical Rough-In | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 15:40:14. Contact: ###-####. b ranch circuit conductors shall run to boxes 9/11/2001 10:18:58 AM
|
Electrical Rough-In | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 15:40:14. Contact: ###-####. b ranch circuit conductors shall run to boxes 9/11/2001 10:18:58 AM
|
Electrical Rough-In | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 16:56:57. Contact: ###-####. clearance form water pipes K.O. seals damaged MC degrees of bend in flex
loose emt 8/13/2001 9:01:38 AM
|
Electrical Rough-In | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 08:38:36. Contact: ###-####.
|