Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PASS |
Mike Kinnear
|
|
|
clint ###-#### ok final 2/21/2002 11:43:03 AM
|
Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 1/2/2002 5:29:38 PM temp occupancy ok
|
Temporary Service | 12/28/2001 | 1/2/2002 | 1/2/2002 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/28/2001 at 14:56:04. Contact: ###-####. see added inspection 1/2/2002 5:29:10 PM
|
Electrical Rough-In | 12/20/2001 | 12/20/2001 | 12/20/2001 | P | FAIL |
Mike Kinnear
|
|
|
Added by Inspector: 412 On 12/20/2001 3:58:16 PM ceiling correction NEC370-23(d) note we have had an inspection on this permit all boxes with 120v will be open for inspection
|
Final | 11/9/2001 | 11/9/2001 | 11/9/2001 | P | PART |
Jack Frank
|
|
|
fn clint cell ###-#### temp occupancy ok for area Jim Storey approved 11/9/2001 10:47:44 AM
|
Electrical Rough-In | 11/6/2001 | 11/6/2001 | 11/6/2001 | P | PART |
Jack Frank
|
|
|
Conference ###-#### aks for Kelly Electric Paul Seymor or Clint Stuerhoff ###-#### ok conduit instsalled by Kelly was paid on PMELE01-00149, by Aztect and taken over byTri-State, PMELE01-03038 see JF for details 11/7/2001 3:47:12 PM
|
ELE-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 | | NR |
Mike Kinnear
|
|
|
suc 10/29/2001 9:26:08 AM
|