Final | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | PASS |
Jack Frank
|
|
|
###-#### ok 1/8/2002 9:57:20 AM
|
Electrical Rough-In | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 12/27/2001 5:35:34 PM conference with Wayne on correction posted at job site
|
Final | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 17:14:01. Contact: ###-####. called 370-28 250-32, needs 2 pole breakers where 2 phases on yoke 12/11/2001 11:37:00 AM
|
Electrical Rough-In | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/29/2001 at 13:54:08. Contact: ###-####. u/g ok 11/30/2001 10:18:06 AM
|
Final | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 11/30/2001 2:36:02 PM temp occupancy ok
|
Permanent Service | 11/30/2001 | 11/30/2001 | 11/30/2001 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/30/2001 at 10:42:52. Contact: ###-####. see added final 11/30/2001 2:35:19 PM
|
Electrical Rough-In | 11/20/2001 | 11/20/2001 | 11/20/2001 | A | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 11/20/2001 10:12:36 AM ok
|
Permanent Service | 11/19/2001 | 11/20/2001 | 11/20/2001 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 10:08:10. Contact: ###-####. no p/s see added r/i 11/20/2001 10:11:53 AM
|
Electrical Rough-In | 11/8/2001 | 11/9/2001 | 11/9/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/08/2001 at 14:26:05. Contact: ###-####. grid ceiling ok 11/9/2001 9:00:47 AM
|
Electrical Rough-In | 11/7/2001 | 11/8/2001 | 11/8/2001 | A | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 14:02:52. Contact: ###-####. see added p/s inspection request 11/7/2001 3:48:40 PM
|
Permanent Service | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 11/7/2001 3:49:20 PM p/s u/g new ok JF
|
Electrical Rough-In | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/05/2001 at 09:31:56. Contact: ###-####. u/g for wash area and perimeter office ceilings
11/5/2001 1:48:40 PM
|
Electrical Rough-In | 10/22/2001 | 10/23/2001 | 10/23/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/22/2001 at 16:28:39. Contact: ###-####. walls and u/g ok 10/23/2001 2:57:39 PM
|
Electrical Rough-In | 10/17/2001 | 10/18/2001 | 10/18/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 15:52:00. Contact: ###-####. u/g for lift station ok 10/18/2001 4:07:22 PM
|
Electrical Rough-In | 10/16/2001 | 10/17/2001 | 10/17/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 15:27:43. Contact: ###-####. u/g ok
10/17/2001 3:26:32 PM
|
Electrical Rough-In | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 08:45:14. Contact: ###-####. u/g ok 10/12/2001 3:48:50 PM
|
Electrical Rough-In | 10/10/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 14:04:41. Contact: ###-####. back area walls and hard ceilings ok 10/11/2001 2:55:46 PM
|
Electrical Rough-In | 10/2/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 16:01:55. Contact: ###-####. 4 hard ceiling areas in office 10/3/2001 2:49:09 PM
|
Electrical Rough-In | 9/20/2001 | 9/21/2001 | 9/21/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 09:10:27. Contact: ###-####. walls in office area ok
9/21/2001 3:51:05 PM
|
Electrical Rough-In | 9/5/2001 | 9/6/2001 | 9/6/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 14:23:22. Contact: ###-####. u/g ok 9/6/2001 4:04:26 PM
|
Electrical Rough-In | 9/4/2001 | 9/5/2001 | 9/5/2001 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 15:22:06. Contact: ###-####. underground they will call when ready 9/5/2001 4:49:39 PM
|
Electrical Rough-In | 8/13/2001 | 8/14/2001 | 8/14/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 16:42:32. Contact: ###-####. u/g for parking lot 8/14/2001 10:51:37 AM
|
Electrical Rough-In | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 13:55:40. Contact: ###-####. slab inspection for concrete 2 floor boxes ok 8/1/2001 9:03:58 AM
|