Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PASS |
Jack Frank
|
|
|
###-#### BILL ok 9/18/2001 10:17:29 AM
|
Final | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | FAIL |
Jack Frank
|
|
|
chain is unlocked at site-- bill ###-#### fn cor. posted called left message 300-10 needs bond bushings where R E washers are used, 370-28(a) (2) shall provide 6 times the diameter of raceway between raceway entries 9/13/2001 1:46:18 PM
|
Permanent Service | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 07:50:52. Contact: ###-####. p/s o/h new ok 8/15/2001 9:50:05 AM
|
Permanent Service | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### cor. posted called 250-64(e), 250-148 8/14/2001 4:14:41 PM
|
Electrical Rough-In | 8/10/2001 | 8/13/2001 | 8/13/2001 | A | PART |
Jack Frank
|
|
|
R/I NEW CONST COM-BETWEEN RED, WHITE, & BLUE BLD-GO IN BACK GATE-CONCRETE ENCLOSED ELECTROID- ###-####-BILL ok for concrete cover 8/13/2001 9:19:00 AM
|
Electrical Rough-In | 8/9/2001 | 8/10/2001 | 8/10/2001 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 17:16:52. Contact: ###-####.CANCEL PER LINDA WITH Z-TECH
|
Electrical Rough-In | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PART |
Jack Frank
|
|
|
###-#### OR BILL ###-#### CONF ONLY ok no permit or inspection for u/g done by builder 8/7/2001 10:25:57 AM
|