Final | 9/20/2001 | 9/24/2001 | 9/24/2001 | A | PASS |
Marv Burrus
|
|
|
###-####completed. 9/24/2001 11:10:18 AM
|
Final | 9/17/2001 | 9/18/2001 | 9/18/2001 | P | PART |
Marv Burrus
|
|
|
###-#### Josh. temporary occupancy only. 9/19/2001 10:15:56 AM
|
Electrical Rough-In | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | PART |
Marv Burrus
|
|
|
issak ###-#### r/i. upstairs r/i, 2-rooms. 9/4/2001 11:14:20 AM
|
Electrical Rough-In | 8/24/2001 | 8/27/2001 | 8/27/2001 | A | PART |
Marv Burrus
|
|
|
r/i- tyler-- ###-#### .ceiling recessed fixtures r/i; 1-room r/i, 1st floor. 8/27/2001 9:03:51 AM
|
Electrical Rough-In | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PART |
Marv Burrus
|
|
|
R/I ISAAC ###-####. 2nd floor; ceiling r/i. 8/20/2001 2:41:05 PM
|
Electrical Rough-In | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PART |
Marv Burrus
|
|
|
###-#### call first and this inspection is for the 1st floor. atm room walls and ceiling r/i. 8/14/2001 3:46:12 PM
|
Electrical Rough-In | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | CANC |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 08:55:45. Contact: ###-####. 8/3/2001 9:57:55 AM. inspection request should have been for final (temp. occup. on 3rd floor). 8/3/2001 9:59:22 AM
|
Final | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 09:56:54. Contact: ###-####. temporary occupancy on 3rd floor. 8/3/2001 10:00:27 AM
|