Final | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 17:45:08. Contact: . ok 9/7/2001 11:30:04 AM
|
Electrical Rough-In | 8/3/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/03/2001 at 07:17:01. Contact: . sun room back of house ok 8/3/2001 1:27:12 PM
|