Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/27/2001 at 10:23:21. Contact: ###-####.
|
Electrical Rough-In | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Joe Ray
|
|
|
###-#### potting for pool light 8/15/2001 9:12:54 AM
|
Electrical Rough-In | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Mike Kinnear
|
|
|
pool bonding ###-#### ok pool bonding 8/3/2001 10:55:24 AM
|
Electrical Rough-In | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | CANC |
Jack Frank
|
|
|
pool bonding ###-#### done by Mike K 8/3/2001 1:04:32 PM
|