Electrical Rough-In | 11/1/2001 | 11/1/2001 | 11/1/2001 | A | PART |
Jack Frank
|
|
|
Added by Inspector: 315 On 11/1/2001 9:21:37 AM u/g in raised road way
|
Final | 10/24/2001 | 10/25/2001 | 10/25/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 14:47:31. Contact: ###-####. ok 10/25/2001 4:27:43 PM
|
Final | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 13:13:56. Contact: ###-####.Recep by slider 10/24/2001 11:37:17 AM
|
Electrical Rough-In | 9/11/2001 | 9/12/2001 | 9/12/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 13:07:38. Contact: ###-####.
|
Electrical Rough-In | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 08:15:05. Contact: ###-####.
|
Rough-In Permanent Service | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/04/2001 at 08:23:30. Contact: .P/S U/G n Ok 9/5/2001 10:54:21 AM
|