Final | 10/19/2001 | 10/22/2001 | 10/22/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/19/2001 at 15:44:29. Contact: ###-####. ok 10/22/2001 11:46:08 AM
|
DOC - Permit Finaled | | | 10/22/2001 | | DONE |
|
|
|
|
Electrical Rough-In | 9/10/2001 | 9/11/2001 | 9/11/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 10:43:09. Contact: ###-####.
|
Electrical Rough-In | 8/29/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 09:38:17. Contact: ###-####. r/i 3 floors ok 8/30/2001 10:59:47 AM
|
Permanent Service | 8/30/2001 | 8/30/2001 | 8/30/2001 | A | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 8/30/2001 11:00:14 AM p/s u/g new ok
|