Final | 7/16/2002 | 7/16/2002 | 7/16/2002 | P | PASS |
Jack Frank
|
|
|
alison; Phone #: ###-#### ok 7/16/2002 5:09:43 PM
|
Final | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | FAIL |
Pat Lass
|
|
|
JEAN ###-#### line load reversed in bathroom 11/30/2001 4:59:05 PM
|
Final | 11/15/2001 | 11/19/2001 | 11/19/2001 | A | FAIL |
Jack Frank
|
|
|
GARY ###-#### cor. posted called 370-16 shall provide proper size boxes kit. island 210-8 gfci protection for all kit. and bath receptacles 11/19/2001 12:02:53 PM
|
Final | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | NH |
Pat Lass
|
|
|
###-#### cell gary No access called got mach. 11/5/2001 9:46:33 AM
|
Electrical Rough-In | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PASS |
Mike Kinnear
|
|
|
###-#### ok cover ri 8/15/2001 1:49:22 PM
|
Electrical Rough-In | 8/13/2001 | 8/14/2001 | 8/14/2001 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 08/13/2001 at 15:27:38. Contact: ###-####. replace broken boxes and move one recep to meet 6' requirement 8/14/2001 2:40:28 PM
|
Electrical Rough-In | 8/13/2001 | 8/13/2001 | 8/13/2001 | P | CANC |
Pat Lass
|
|
|
###-#### please call--CANCEL- ANNA
|