Final | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 08:38:45. Contact: ###-####.
|
Final | 9/28/2001 | 9/28/2001 | 9/28/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 10:06:16. Contact: ###-####. not ready 9/28/2001 12:32:05 PM
|
Electrical Rough-In | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 16:28:51. Contact: ###-####. only check bond to fram /no hand rails,lights,diving board or pool cover 8/15/2001 10:30:41 AM
|