Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 08:56:25. Contact: ###-####.
|
Final | 10/31/2001 | 10/31/2001 | 10/31/2001 | P | FAIL |
Pat Lass
|
|
|
###-#### dan Main b reaker no retainer on backfed breaker 10/31/2001 2:17:01 PM
|
Final | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | PART |
Joe Ray
|
|
|
###-#### DAN temp occup for offices 10/23/2001 12:50:36 PM
|
Permanent Service | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | PASS |
Pat Lass
|
|
|
per ser -dan- cell ###-#### P/S U/G N Ok 10/2/2001 2:37:38 PM
|
Electrical Rough-In | 9/26/2001 | 9/26/2001 | 9/26/2001 | P | PASS |
Joe Ray
|
|
|
###-####
|
Electrical Rough-In | 9/25/2001 | 9/25/2001 | 9/25/2001 | P | FAIL |
Pat Lass
|
|
|
r/i- dan cell ###-####- -inside & out insp correction not made 9/25/2001 3:35:45 PM
|
Electrical Rough-In | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | FAIL |
Joe Ray
|
|
|
r/i- dan ###-#### 300-6 1 1/4 protection of mc cable/shall bond metal boxes 9/24/2001 3:57:08 PM
|
Electrical Rough-In | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 09:23:58. Contact: ###-####.
|