Final | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 09:45:03. Contact: ###-####.
|
Electrical Rough-In | 9/17/2001 | 9/18/2001 | 9/18/2001 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 19:10:10. Contact: ###-####.
|
Electrical Rough-In | 9/7/2001 | 9/10/2001 | 9/10/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 13:33:13. Contact: ###-####. work covered with out inspection 9/10/2001 9:58:23 AM
|
Electrical Rough-In | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | CANC |
Joe Ray
|
|
|
george-- ###-#### r/i for ok to cover or kim- ###-####
|