Final | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PASS |
Pat Lass
|
|
|
###-#### joe
|
Final | 7/6/2003 | 7/7/2003 | 7/7/2003 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 7/6/2003 at 10:47:28 AM. Contact: ###-####. cor. and $42.00 fee due posted met with contracor needs gfci all bath recepts shower trims, complete all wiring install approved light with clearence in MB closet 7/7/2003 1:57:44 PM
|
Electrical Rough-In | 2/10/2003 | 2/10/2003 | 2/10/2003 | P | PASS |
Joe Ray
|
|
|
joe homeowner-- call 1st before insp ###-####
|
Final | 1/31/2002 | 2/1/2002 | 2/1/2002 | A | PART |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 01/31/2002 at 17:06:33. Contact: ###-####. final on garage ok /master bedroom addition not ready 2/1/2002 10:00:49 AM
|
ELE-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | NR |
Marv Burrus
|
|
|
still under construction. 1/8/2002 7:52:33 AM
|
Electrical Rough-In | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PASS |
Joe Ray
|
|
|
###-#### call first to meet there p/s oh r 10/9/2001 9:49:54 AM ok 10/9/2001 9:50:48 AM
|