Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PASS |
Jim Schmer
|
|
|
###-####
|
Electrical Rough-In | 8/23/2001 | 8/24/2001 | 8/24/2001 | A | CANC |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 21:35:40. Contact: ###-####.
|
Electrical Rough-In | 8/24/2001 | 8/24/2001 | 8/24/2001 | A | FAIL |
Mike Kinnear
|
|
|
per Mike send this back to him4404727 corrtions NEC680-22(b),680-23(b),680-10 & land the service ground properly 8/24/2001 9:31:31 AM
|
Electrical Rough-In | 8/24/2001 | 8/24/2001 | 8/24/2001 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 10:43:08. Contact: ###-####. ok cover underground conduit & ok fixture potting 8/24/2001 3:24:07 PM
|