Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 11:14:41. Contact: ###-####.
|
Electrical Rough-In | 9/28/2001 | 10/1/2001 | 10/1/2001 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/28/2001 at 11:47:21. Contact: ###-####.
|
Electrical Rough-In | 9/27/2001 | 9/28/2001 | 9/28/2001 | A | FAIL |
Pat Lass
|
|
|
###-#### BOB improper support 9/28/2001 10:48:31 AM
|
Rough-In Permanent Service | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | DONE |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 09:06:04. Contact: ###-####. done by PLass 09/17/01 9/20/2001 1:33:15 PM
|
Electrical Rough-In | 9/14/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 13:45:10. Contact: ###-####.
|
Permanent Service | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PASS |
Pat Lass
|
|
|
Added by Inspector: 336 On 9/17/2001 2:33:22 PM P/S U/G N Ok
|