Final | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 07:48:09. Contact: ###-####.
|
Final | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/08/2001 at 17:22:28. Contact: ###-####. 210-52 6ft from door way and wall over 2 ft 10/9/2001 12:34:54 PM
|
Rough-In Permanent Service | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 09/07/2001 at 09:51:51. Contact: ###-####. p/s ug n ok 9/7/2001 2:30:06 PM
|
Electrical Rough-In | 9/4/2001 | 9/6/2001 | 9/6/2001 | A | FAIL |
Mike Kinnear
|
|
|
STEVE ###-#### correction no windows 9/6/2001 10:13:10 AM
|