Final | 10/17/2001 | 10/18/2001 | 10/18/2001 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 14:40:32. Contact: ###-####.
|
Final | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 08:05:27. Contact: ###-####. open ground bathroom recpt 10/17/2001 1:11:24 PM
|
Electrical Rough-In | 9/4/2001 | 9/6/2001 | 9/6/2001 | A | PASS |
Joe Ray
|
|
|
STEVE ###-#### p/s ug n ok 9/6/2001 10:17:29 AM
|