Final | 9/17/2001 | 9/19/2001 | 9/19/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 12:27:33. Contact: ###-####. p/s o/h rec. ok 9/19/2001 2:17:44 PM
|
Permanent Service | 9/19/2001 | 9/19/2001 | 9/19/2001 | P | PASS |
Jack Frank
|
|
|
Added by Inspector: 315 On 9/19/2001 2:19:56 PM p/s o/h rec. ok
|
Final | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 16:17:08. Contact: ###-####. cor. posted called see JF for details cow 9/7/2001 9:29:57 AM
|