Final | 10/24/2001 | 10/25/2001 | 10/25/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 18:15:27. Contact: ###-####.
|
Final | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 07:45:13. Contact: ###-####. 210-52 outlet spacing in dinng room /label panel 10/24/2001 1:08:06 PM
|
Rough-In Permanent Service | 9/20/2001 | 9/26/2001 | 9/26/2001 | A | PASS |
Joe Ray
|
|
|
###-#### p/s ug n ok 9/26/2001 2:20:40 PM
|