ELE-Aging Inspection | 12/16/2002 | 12/16/2002 | 12/16/2002 | | PASS |
Mike Kinnear
|
|
|
315 final 1/25/02 12/16/2002 8:02:02 AM
|
Final | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 11:44:55. Contact: ###-####. all 4 cards signed 1/24/2002 3:04:58 PM
|
Final | 1/23/2002 | 1/24/2002 | 1/24/2002 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/23/2002 at 15:55:39. Contact: ###-####. correction 410-14 (b) need to punch k o in fixture for access to box talked with contractor at job site 1/24/2002 10:27:25 AM
|
Electrical Rough-In | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 01/17/2002 at 09:40:26. Contact: ###-####. grid ceilings ok 1/17/2002 5:20:12 PM
|
Permanent Service | 12/19/2001 | 12/20/2001 | 12/20/2001 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 11:37:43. Contact: ###-####. p/s u/g new ok 12/19/2001 3:22:34 PM
|
Electrical Rough-In | 12/18/2001 | 12/18/2001 | 12/18/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 10:21:33. Contact: ###-####. u/g for parking lot 12/18/2001 4:36:01 PM
|
Electrical Rough-In | 12/11/2001 | 12/12/2001 | 12/12/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 11:34:50. Contact: ###-####. basement hard ceiling 12/12/2001 4:10:43 PM
|
Electrical Rough-In | 12/6/2001 | 12/6/2001 | 12/6/2001 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/06/2001 at 08:16:48. Contact: ###-####. partial walls, and hallway hard ceiling ok 12/6/2001 1:56:28 PM
|
Electrical Rough-In | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 16:31:05. Contact: ###-####. electrode not ready 10/18/2001 9:57:21 AM
|