Final | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Mike Kinnear
|
|
|
DAN ###-#### ok final survey wires on screws installed backwards 11/30/2001 12:44:22 PM
|
Final | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | NR |
Mike Kinnear
|
|
|
fn --dan-- ###-#### not ready to call in tomorrow 11/29/2001 2:12:32 PM
|
Rough-In Permanent Service | 10/25/2001 | 10/25/2001 | 10/25/2001 | P | CANC |
Mike Kinnear
|
|
|
###-#### DAN canc. wrong house number 10/25/2001 2:53:55 PM
|
Electrical Rough-In | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | FAIL |
Jack Frank
|
|
|
###-#### brian walls were added outlet spacing and 300-4 11/4 inches called 10/9/2001 11:04:50 AM
|
Electrical Rough-In | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PASS |
Jack Frank
|
|
|
###-#### BRIAN r/i p/s u/g new ok 10/9/2001 1:58:20 PM
|
Rough-In Permanent Service | 10/5/2001 | 10/8/2001 | 10/8/2001 | A | FAIL |
Jack Frank
|
|
|
###-#### BRIAN cor. posted called left message see JF for details 10/8/2001 10:17:14 AM
|